From initial consultation to keys in hand in just 6-8 months. Our full-service team handles everything - permits, foundation, installation, and utilities.
Every step handled by our experienced team with transparent communication throughout
Schedule your free consultation to discuss your needs, budget, and timeline.
We evaluate your land for suitability and requirements.
Choose and customize your perfect manufactured home.
Secure financing with our preferred lenders or your own.
We handle all permits and regulatory approvals.
Paulden Specific: Rural residential zoning allows manufactured homes.
Prepare your land for home installation.
Paulden Foundation: Stem wall or above ground with skirting
Soil Type: High desert soil with variable composition
Frost Line: 18-24 inches
Your home is delivered and professionally installed.
Final inspections and you receive your keys!
6-8 Months
Complete installation vs 12-18 months for site-built homes
50-70% Less
Than traditional construction in Paulden
HUD Certified
Built to strict federal standards with warranties
Ready to Start Your Paulden Home Journey?
Join hundreds of satisfied homeowners who saved time and money with manufactured homes
Every location has unique requirements. Here's how we handle Paulden's specific challenges.
Installation in Paulden typically takes 6-8 months due to the rural location requiring well drilling, septic installation, and coordination with multiple utility providers. Yavapai County permits process efficiently, but site preparation takes longer.
Most Paulden properties require private wells for water, septic systems for wastewater, and propane for heating/cooking. Limited APS electric service is available. We coordinate all utility installations including well drilling, septic design, and propane system setup.
Yes, we handle all Yavapai County permits for rural residential manufactured home installations in Paulden. The process is streamlined for rural areas, and we coordinate with county Environmental Services for well and septic approvals.