Your Complete Manufactured Home Installation Process in Kingman, Arizona

From initial consultation to keys in hand in just 6-8 months. Our full-service team handles everything - permits, foundation, installation, and utilities.

6-8 Month Timeline
All Permits Handled
Full Installation
Single Point of Contact

Kingman Quick Facts

  • Foundation Type:Stem wall or above ground with skirting
  • County:Mohave
  • Distance to Phoenix:210 miles
  • Zoning Notes:Multiple zoning districts allow manufactured homes

Your 6-8 Month Journey to Homeownership in Kingman

Every step handled by our experienced team with transparent communication throughout

Stage 1: Free Consultation

Schedule your free consultation to discuss your needs, budget, and timeline.

  • Review your land or help you find the perfect lot
  • Discuss floor plans and customization options
  • Explain financing options
  • Provide transparent pricing

Stage 2: Land Evaluation

We evaluate your land for suitability and requirements.

  • Soil analysis and testing
  • Survey and boundary verification
  • Utility availability assessment
  • Zoning compliance check

Stage 3: Home Selection & Customization

Choose and customize your perfect manufactured home.

  • Tour available models
  • Select floor plan
  • Choose finishes and upgrades
  • Finalize specifications

Stage 4: Financing & Approval

Secure financing with our preferred lenders or your own.

  • Application assistance
  • FHA, VA, USDA, or conventional loans
  • Down payment options
  • Final approval

Stage 5: Permits & Approvals

We handle all permits and regulatory approvals.

  • Building permits
  • Zoning approvals
  • Environmental clearances
  • HOA approvals (if applicable)

Kingman Specific: Multiple zoning districts allow manufactured homes.

Stage 6: Site Preparation

Prepare your land for home installation.

  • Foundation installation
  • Utility connections prep
  • Driveway and access roads
  • Septic/sewer connections

Kingman Foundation: Stem wall or above ground with skirting

Soil Type: Desert hardpan with rocky substrate

Frost Line: 12 inches

Stage 7: Home Delivery & Installation

Your home is delivered and professionally installed.

  • Factory construction completion
  • Transportation to your site
  • Professional installation
  • Utility connections

Stage 8: Final Inspection & Move-In

Final inspections and you receive your keys!

  • County/city inspections
  • Final walkthrough
  • Warranty activation
  • Keys handover

Why Kingman Homebuyers Choose Manufactured Homes

Move In Faster

6-8 Months

Complete installation vs 12-18 months for site-built homes

Save Money

50-70% Less

Than traditional construction in Kingman

Quality Guaranteed

HUD Certified

Built to strict federal standards with warranties

Ready to Start Your Kingman Home Journey?

Join hundreds of satisfied homeowners who saved time and money with manufactured homes

Call (928) 361-0298

What's Included in Your Kingman Installation

✓ Included Services

  • All Kingman permit fees
  • Site evaluation and survey
  • Foundation installation
  • Home delivery to Kingman
  • Professional installation crew
  • Utility connections
  • Final inspections
  • 1-year installation warranty

Kingman Installation Stats

  • Average Timeline:6-8 months
  • Permit Fees:$2800-3800
  • Installation Crew:Western Arizona Team
  • Soil Type:Desert hardpan with rocky substrate
  • Inspection Notice:3-5 business days advance notice

Kingman-Specific Challenges & Our Solutions

Every location has unique requirements. Here's how we handle Kingman's specific challenges.

Common Kingman Challenges

  • High desert climate with extreme temperature swings
  • Rocky desert terrain requiring specialized excavation
  • Wind load considerations in exposed desert location
  • Limited water resources requiring conservation measures
  • Coordination with Mohave County building department

Our Kingman Solutions

  • Mohave County residential building permits
  • Wind load calculations for desert exposure
  • Water conservation fixture requirements
  • Desert landscaping compliance
  • Minimal frost protection due to mild winters

Utility Providers in Kingman

UniSource Energy (Electric)
Southwest Gas
City of Kingman (Water/Sewer)

Common Questions About Kingman Installation

How do you handle Kingman's desert climate and rocky terrain?

Kingman's high desert location requires foundations designed for rocky hardpan soil and extreme temperature swings. We use specialized excavation equipment for the rocky terrain and design foundations to handle thermal expansion in the desert climate.

What permits are needed through Mohave County for Kingman?

Kingman installations require Mohave County building permits with wind load calculations due to the exposed desert location. We handle all permit coordination and ensure compliance with county building standards for manufactured homes.

Ready to Start Your Kingman Home Process?

Current delivery time to Kingman: 6-8 months

Ready to Start

Begin your journey today

Need Information

Get our free guide

Have Land

Get free evaluation

Serving Kingman and all of Mohave County with in-house installation teams