Your Complete Manufactured Home Installation Process in Dewey, Arizona

From initial consultation to keys in hand in just 6-8 months. Our full-service team handles everything - permits, foundation, installation, and utilities.

6-8 Month Timeline
All Permits Handled
Full Installation
Single Point of Contact

Dewey Quick Facts

  • Foundation Type:Stem wall or above ground with skirting
  • County:Yavapai
  • Distance to Phoenix:95 miles
  • Zoning Notes:Rural residential allows manufactured homes

Your 6-8 Month Journey to Homeownership in Dewey

Every step handled by our experienced team with transparent communication throughout

Stage 1: Free Consultation

Schedule your free consultation to discuss your needs, budget, and timeline.

  • Review your land or help you find the perfect lot
  • Discuss floor plans and customization options
  • Explain financing options
  • Provide transparent pricing

Stage 2: Land Evaluation

We evaluate your land for suitability and requirements.

  • Soil analysis and testing
  • Survey and boundary verification
  • Utility availability assessment
  • Zoning compliance check

Stage 3: Home Selection & Customization

Choose and customize your perfect manufactured home.

  • Tour available models
  • Select floor plan
  • Choose finishes and upgrades
  • Finalize specifications

Stage 4: Financing & Approval

Secure financing with our preferred lenders or your own.

  • Application assistance
  • FHA, VA, USDA, or conventional loans
  • Down payment options
  • Final approval

Stage 5: Permits & Approvals

We handle all permits and regulatory approvals.

  • Building permits
  • Zoning approvals
  • Environmental clearances
  • HOA approvals (if applicable)

Dewey Specific: Rural residential allows manufactured homes.

Stage 6: Site Preparation

Prepare your land for home installation.

  • Foundation installation
  • Utility connections prep
  • Driveway and access roads
  • Septic/sewer connections

Dewey Foundation: Stem wall or above ground with skirting

Soil Type: High desert caliche with granite substrate

Frost Line: 18 inches

Stage 7: Home Delivery & Installation

Your home is delivered and professionally installed.

  • Factory construction completion
  • Transportation to your site
  • Professional installation
  • Utility connections

Stage 8: Final Inspection & Move-In

Final inspections and you receive your keys!

  • County/city inspections
  • Final walkthrough
  • Warranty activation
  • Keys handover

Why Dewey Homebuyers Choose Manufactured Homes

Move In Faster

6-8 Months

Complete installation vs 12-18 months for site-built homes

Save Money

50-70% Less

Than traditional construction in Dewey

Quality Guaranteed

HUD Certified

Built to strict federal standards with warranties

Ready to Start Your Dewey Home Journey?

Join hundreds of satisfied homeowners who saved time and money with manufactured homes

Call (928) 361-0298

What's Included in Your Dewey Installation

✓ Included Services

  • All Dewey permit fees
  • Site evaluation and survey
  • Foundation installation
  • Home delivery to Dewey
  • Professional installation crew
  • Utility connections
  • Final inspections
  • 1-year installation warranty

Dewey Installation Stats

  • Average Timeline:6-8 months
  • Permit Fees:$1400-2200
  • Installation Crew:Tri-Cities Team
  • Soil Type:High desert caliche with granite substrate
  • Inspection Notice:3-5 business days advance notice

Dewey-Specific Challenges & Our Solutions

Every location has unique requirements. Here's how we handle Dewey's specific challenges.

Common Dewey Challenges

  • Unincorporated Yavapai County permits required
  • Limited utility infrastructure in rural areas
  • Well and septic systems common
  • High desert soil conditions
  • Coordination with county building department

Our Dewey Solutions

  • Yavapai County unincorporated area permits
  • Well drilling and water quality testing
  • Septic system design and installation
  • 18-inch frost protection required
  • Rural access road considerations

Utility Providers in Dewey

APS (Electric - Limited)
Southwest Gas (Very limited)
Private Wells (Most common)
Private Septic Systems

Common Questions About Dewey Installation

How long does installation take in unincorporated Dewey?

Installation in Dewey takes 6-8 months . As an unincorporated area, most properties require private wells and septic systems which extend the timeline for utility coordination.

What utilities are available in Dewey's rural area?

Dewey has limited APS electric service with most homes requiring private wells for water and septic systems for wastewater. Southwest Gas is very limited. We coordinate all rural utility installations including well drilling and septic design.

Ready to Start Your Dewey Home Process?

Current delivery time to Dewey: 6-8 months

Ready to Start

Begin your journey today

Need Information

Get our free guide

Have Land

Get free evaluation

Serving Dewey and all of Yavapai County with in-house installation teams